4 Out of 5 Linear Infrastructure Construction Companies Trust TILOS Linear Scheduling Software
Why TILOS?
A must-have for leading infrastructure companies across the globe, TILOS (Time LOcation System) linear scheduling software empowers Project Planning & Scheduling Managers, Contractors, and Project Owners to create and execute a reliable, comprehensive and easy way to communicate linear project plan and schedule.
The Linear Scheduling is a graphical scheduling method that focuses on continuous use of resources, in a repetitive manner, along both a time and a distance axis.
Trimble TILOS software was developed specifically to address the unique challenges of linear projects such as roads, railway, pipeline, power transmission, and bridges. It is an essential tool for professionals in the construction, engineering and energy sectors.
Using traditional
project management scheduling software can often create
FRUSTRATION
Difficult to gather enough accurate data to create a baseline you can rely on.
UNCERTAINTY
Challenging to determine what work has been done and where along the right of way.
CONFUSION
Communicating a multi-page GANTT chart plan to field personnel and stakeholders creates more confusion than clarity.
INEFFICIENCIES
Clashes are hard to prevent and equipment move-arounds generate a huge volume of unnecessary tasks.
INACCURACIES
Mass haulage and the rate of productivity of crews is hard to calculate accurately.
TILOS Linear Scheduling
Software Advantages
WORK WITH CONFIDENCE:
CREATE A RELIABLE PLAN AND OPTIMIZE WITH EASE
Equipment move-arounds and skips are a fact of construction. TILOS enables you to easily modify the plan and it automatically updates time and costs.
Sequentially start your crews using distance-based lags to reduce total construction time while preventing one crew from catching up to another.
Plan around ROW access challenges like weather, permitting, crossings and other variables unique to the project.
Incorporate elevation profiles, land acquisition, spend curves, Geotech data, environmental windows, crossings and crew movement and direction of travel along the ROW.
KEEP IT SIMPLE:
WITH COMMON GOAL AND STRATEGY
Show the entire project scope on one Time Distance chart.
GANTT charts are an ineffective way to communicate to field personnel. Show your crews what work has been finished and where and plan for the next day’s activities.
Present and communicate the project’s complexities to various parties including stakeholders, contractors, junior engineers and owner companies.
CONTROL YOUR DATA:
INTEGRATES WITH CONVENTIONAL PM TOOLS
Integrate with Primavera P6, Microsoft Project and PowerProject.
Import data such as crossings, mass haul, elevation or site map.
Insert quantities, equipments and costs from spreadsheets.
STRENGTHEN EXECUTION:
WITH INCREASED COMMUNICATION, CONTROL, & PROFITABILITY
Coordinate schedules to avoid project clashes.
Spot issues and solve them before they raise costs.
Optimize continuous production of crews and equipment based on data.
Evaluate the impact of any scope changes and project delays
IMPROVE EFFICIENCY AND COMMUNICATE CLEARLY:
IDENTIFY RISK AND OPPORTUNITIES AT A GLANCE
Schedule the time and distance between crews to maximum effectiveness.
Complete accurate baseline integrating execution information.
View the entire scope in one view to identify potential risks and opportunities to accelerate the schedule.
Modify equipment sequencing and crew productivity rates to reduce inefficiencies and accelerate the project.